韶钢2200m^3高炉处理炉缸冻结实践

Practice of Treating Hearth Freezing in 2200 m^3 Blast Furnace at Shaogang
下载PDF
导出
摘要 韶钢2200 m^3高炉因事故造成炉缸冻结,复产前进行了严密的组织策划,制定了科学、详细的复产方案,有效的风口前渣铁清理和封堵,采用氧枪加热技术,渣铁及时排放,仅用了26天,高炉快速恢复正常。 Due to the accident,the furnace cylinder of the 2200 m^3 blast furnace in Shaogang was frozen.Before the resumption of production,the strict organization and planning were carried out,and a scientific and fine resumprion plan was formilated.The slag iron before the tuyere was cleaned and blocked effectively.
作者 蒋兵 陈生利 JIANG Bin;CHEN Sheng-li(Guangdong Shaoguan Iron and Steel Corporation,Iron Works,Shaoguan 512123,China)
出处 《甘肃冶金》 2020年第4期25-28,共4页 Gansu Metallurgy
关键词 高炉 炉缸冻结 渣铁排放 the blast furnace hearth freeze iron slag emission