摘要 研究了轮斗开采工艺在塔尔煤田Ⅱ区块露天煤矿三期工程应用的可行性,结合岩层特征,针对表土松散层剥离工程,分析了单斗-卡车工艺与轮斗工艺的设备投资及运行成本,计算了露天矿不同时间范围内2种工艺的投资及成本NPV值。结果表明:虽然轮斗工艺初期设备投资高,但其低生产成本的优势在数年后就开始体现,有利于实现露天矿的高产高效。 The article researches the feasibility of bucket wheel mining technology in phaseⅢof Thar Coalfield BlockⅡOpen-pit Coal Mine.Combining with the characteristics of rock strata,aiming the stripping engineering of topsoil layer,the article analyzes the equipment investment and operating cost of shovel truck technology and bucket wheel technology,calculates the investment and cost NPV values of the two technology in different time ranges of the open-pit mine.The results show that although the initial equipment investment of bucket wheel technology is high,its advantages of low operating cost begin to be reflected after several years,which is conducive to realizing high yield and high efficiency of open-pit mine.
作者 刘英璐 LIU Yinglu(China Coal Technology and Engineering Group Shenyang Design&Research Institute,Shenyang 110015,China)
出处 《露天采矿技术》 CAS 2020年第4期75-78,共4页 Opencast Mining Technology
关键词 剥离工艺 优化方案 轮斗工艺 设备投资 运营成本 NPV值 stripping technology optimization scheme bucket wheel technology equipment investment operating cost NPV value
  • 相关文献

参考文献5

二级参考文献26

共引文献25

同被引文献18

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部