期刊文献+

煤矿井下排水系统方案的研究与设计 被引量:3

Study and Design of Underground Drainage System in Coal Mine
下载PDF
导出
摘要 针对煤矿井下排水系统存在的运行效率低下、控制策略单一的问题,以吉安矿排水系统为研究对象,提出基于排水系统模型的排水方案,给出详细硬件设计和软件设计,并对该方案中的故障与保护进行分析。综合考虑"高低水位"以及"避峰就谷"的排水方案,可降低劳动强度,改善劳动环境,达到节能降耗的目的。 Aiming at the problems of low operation efficiency and single control strategy of underground drainage system in coal mine, taking the drainage system of Ji’an mine as the research object, this paper puts forward the drainage scheme based on the drainage system model, gives the detailed hardware design and software design, and analyzes the faults and protection in this scheme. Considering the drainage scheme of "high and low water level" and "avoiding peak and valley ", the design reduces the labor intensity, improves the working environment and achieves the purpose of saving energy and reducing consumption.
作者 散利鹏 San Lipeng(Sanyuan Nanyao Ji'an Coal Industry Co.,Ltd.,Changzhi Shanxi 046000)
出处 《机械管理开发》 2020年第9期241-242,259,共3页 Mechanical Management and Development
关键词 数学模型 控制策略 PLC 避峰就谷 排水系统 mathematical model control strategy PLC peak-shaving valley drai
  • 相关文献

参考文献7

二级参考文献43

共引文献73

同被引文献12

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部