期刊文献+

基于全寿命周期成本分析的桥梁设计方案比选 被引量:3

Comparison and Selection of Bridge Design Scheme Based on Life Cycle Cost Analysis
下载PDF
导出
摘要 为指导临猗黄河大桥初步设计,确定初步设计推荐方案,利用桥梁全寿命周期分析方法,对重点推荐的钢箱组合梁与混凝土连续刚构两个初步设计方案进行分析,从桥梁建设到运营结束全寿命期内的成本进行分析比较。结果表明:材质为耐候钢的钢箱组合梁桥型全寿命周期成本最低,确定该方案为初步设计推荐方案。 In order to guide the preliminary design of Linyi Yellow River Bridge and determine the preliminary design proposal,by using the life cycle cost analysis of the bridge,the two highly recommended design schemes of steel box composite beam and concrete continuous rigid frame were analyzed and compared in terms of the life cycle cost from the beginning of the construction to the end of the operation.The results showed that the steel box composite beam bridge made of the weathering resistant steel had the lowest life cycle cost,which can be the most recommended for the preliminary design.
作者 李鹏飞 LI Peng-fei(Shanxi Transportation Survey&Design Institute Co.,Ltd.,Taiyuan,Shanxi 030032,China)
出处 《山西交通科技》 2020年第4期91-93,142,共4页 Shanxi Science & Technology of Transportation
关键词 全寿命周期成本 桥梁设计方案 比选 成本最低 life cycle cost bridge design scheme comparison and selection lowest cost
  • 相关文献

参考文献7

二级参考文献38

  • 1GUO YongQiang1, CHEN WeiQiu2,3 & ZHANG YongLiang4 1 Key Laboratory of Mechanics on Disaster and Environment in Western China, Ministry of Education, and School of Civil Engineering and Mechanics, Lanzhou University, Lanzhou 730000, China,2 Key Laboratory of Soft Soils and Geoenvironmental Engineering, Ministry of Education, and Department of Civil Engineering, Zhejiang University, Hangzhou 310058, China,3 Department of Engineering Mechanics, Zhejiang University, Hangzhou 310027, China,4 School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou 730070, China.Guided wave propagation in multilayered piezoelectric structures[J].Science China(Physics,Mechanics & Astronomy),2009,52(7):1094-1104. 被引量:4
  • 2陈宝春,牟廷敏,陈宜言,黄冀卓.我国钢-混凝土组合结构桥梁研究进展及工程应用[J].建筑结构学报,2013,34(S1):1-10. 被引量:120
  • 3吴海军,陈艾荣.寿命周期成本分析方法在桥梁工程中的应用[J].公路,2004,49(12):34-38. 被引量:50
  • 4吴海军,陈艾荣.桥梁结构耐久性设计方法研究[J].中国公路学报,2004,17(3):57-61. 被引量:54
  • 5叶文亚,李国平,范立础.桥梁全寿命成本初步分析[J].公路,2006,51(6):101-104. 被引量:36
  • 6Officer Asset Management, Department of Transportation, FHWA. Life-Cycle Cost Analysis Primer[R].2002.
  • 7Kong J S, Frangopol D M. Prediction of reliability and cost of deteriorating bridges under time-and performance-controlled maintenance [J]. J. of Str.Eng., ASCE, 2004,130(12).
  • 8Hassanain M A, Loov R E. Cost optimization of concrete bridge infrastructure[J]. Canadian Journal of Civil Engineering, 2003,30.
  • 9Liu C, Hammad A, Itoh Y. Multiobjective optimization of bridge deck rehabilitation using a genetic algorithm [J]. Computer-aided Civil and infrastructure Engineering, 1997,12.
  • 10Miyamoto A, Kawamura K, Nakamura H. Bridge management system and maintenance optimization for existing bridge [J]. Computer-aided Civil and Infrastructure Engineering, 2000,15.

共引文献202