摘要
文中以盾构下穿地下商业街为工程背景,结合该工程的工程环境,通过数值模拟、自动化监测和人工监测等手段,对盾构下穿商业街风险控制措施进行施工前模拟、施工过程中监测和控制,阐述了地下商业街控制措施的有效性。该工程中技术措施的成功应用,对以后类似工程的施工具有借鉴意义。
The shield construction crossed with underground shopping streets is the engineering context in this paper,and the risk control technologies were proposed.The effectiveness of which was stated through the pre-construction simulation,and monitoring during the construction.The successful application of the proposed technologies in this project may provide the reference to similar projects in the future.
作者
袁明
胥稳
孙银娟
丁宇
宦雯
王纯
YUAN Ming;XU Wen;SUN Yinjuan;DING Yu;HUAN Wen;WANG Chun(Changzhou Rail Transit Development Co.,Ltd.,Jiangsu Changzhou 213022,China;The First Geological Team of Jiangsu Bureau of Geology And Mineral Exploration,Nanjing 210041,China;Nanjing Kentop Givil Engineering.Technology Co.,Ltd.,Nanjing 210041,China)
出处
《低温建筑技术》
2020年第10期133-137,共5页
Low Temperature Architecture Technology
基金
常州地铁科研项目GD-ZG-18008。
关键词
盾构
数值模拟
监测
控制技术
shield construction
numerical simulation
monitoring
control measures