摘要 高速铁路隧道穿越软弱地层时,常采用冲击钻打孔的桩基加固隧底地层,冲击钻施工时会对隧道衬砌产生动力影响。文章依托贵南高铁德庆隧道,采用FLAC 3D数值模拟研究冲击钻施工至隧底下不同深度(15 m,20 m,25 m和29 m)时衬砌的动力响应。结果表明:不同振源深度下,隧道衬砌位移、最大主应力及速度响应差别不大。应力最大处位于距振中约20 m的左、右边墙处;对于隧道衬砌的速度响应,其最大发生在冲击钻施工开始时,此时出现显著峰值,随后衬砌速度值逐渐稳定;冲击钻施工时位移分布存在较明显的范围,其分布由振中向隧道两端逐渐减小,由拱底至边墙至拱顶逐渐减小。但位移量较大,最大可达4.95 cm,属大变形,因此应及时做好支护,避免隧道发生塌方。 The construction of pile foundations by percussion drills is generally carried out for reforcing tunnel base ground in high-speed railway tunnels passing weak strata.However,the process can influence tunnel linings dynamically.Based on the Deqing tunnel on the Guinan high-speed railway,a series of numerical simulations are performed to acquire the dynamic response of the linings when the percussion drilling is at different depths(15 m,20 m,25 m,and 29 m)under the tunnel base.The results show that the displacement,maximum principal stress,and velocity response of the linings vary slightly at the specified depths.The maximum stress is at the left and right walls about 20 m away from the epicenter.The peak velocity,occurring at the commencement of the excitation,is detected at the tunnel bottom,and then its value gradually trends to stabilization.The displacement progressively declines from the epicenter to both the tunnel ends,and from the tunnel bottom to the sidewalls to the crown;the maximum displacement can reach a range of large deformation of 4.95 cm,thus reinforced supports are required to avoid tunnel collapses.
作者 周军伟 ZHOU Junwei(Yungui Railway Guangxi Co.,Ltd.,Nanning 530000)
出处 《现代隧道技术》 EI CSCD 北大核心 2020年第S01期179-190,共12页 Modern Tunnelling Technology
关键词 山岭隧道 桩基施工 冲击钻 衬砌 动力响应 数值模拟 Mountain tunnel Construction of pile foundation Percussion drill Lining Dynamic response Numerical simulation
  • 相关文献

参考文献2

二级参考文献19

  • 1傅智.新拌混凝土振动结构粘度研究[J].公路交通科技,1996,13(3):1-9. 被引量:38
  • 2岩崎训明 尹家辛等(译).混凝土的特性[M].北京:中国建筑工业出版社,1980..
  • 3BASTIAN C E. The Effect of Vibrations on Freshly Poured Concrete [ J ]. Foundation Facts, 1970, 6 (1): 14 - 17.
  • 4DUNHAM M R. Effects of Induced Vibrations on Early Age Concrete [ J]. Journal of Performance of Constructed Facilities, 2007, 21 (3): 179-183.
  • 5郑仁健.二次振动与混凝土强度特性研究[D].武汉:华中科技大学,2005.
  • 6HARAH S, DARWIN D. Effects of Traffic Induced Vibrations on Bridge Deck Repairs [ R ]. Kansas: University of Kansas Center for Research, Inc., 1984: 4 -10.
  • 7MANNING D G. Effects of Traffic - induced Vibrations on Bridge - deck Repairs [ R ]. Washington, D. C. : Transportation Research Board, 1981 : 3 - 8.
  • 8ISSA M A. Investigation of Cracking in Concrete Bridges Decks at Early Ages [ J ]. Journal of Bridge Engineering, 1999, 4 (2) : 116 - 124.
  • 9MAMLOUK M S, ZANIEWSKI J P. Materials for Civil and Construction Engineers [ M ]. New Jersey: Pearson Education, Inc. , 2006.
  • 10ZHANG Changsuo. Effects of Blast Induced Vibrations on the Fresh Concrete Lining of a Shaft [ J ]. Tunneling and Underground Space Technology, 2005, 20: 356- 361.

共引文献20