摘要 针对不同电价对水电站装机容量影响的决策问题,通过水力发电过程相关物理参数的数学建模,揭示了水电站投入产出关系曲线的凸性,利用经济学的边际分析原理,得出在利润最大化的原则下,水电站年化投资的边际单位电度成本等于电价时,水电站取得最优投资和最优装机容量,从而阐明了电价与水电站装机容量相互影响的内在规律,为选择水电站装机容量提供了技术经济理论依据。 Aiming at the decision-making problem of the influence of different electricity prices on the installed capacity of hydropower stations,the convexity of the relationship curve between the input and output of hydropower stations is revealed through the mathematical modeling of relevant physical parameters in the process of hydropower generation.Under the principle of profit maximization,by using the marginal analysis principle in economics,it is concluded that when the marginal unit electricity cost of annual investment of hydropower station is equal to the electricity price,the hydropower station can obtain the optimal investment and the optimal installed capacity.Thus,the internal law of the interaction between the electricity price and the installed capacity of the hydropower station is clarified,which provides the technical and economic theoretical basis for the selection of the installed capacity of the hydropower station.
作者 郑程遥 邵春兵 黄定波 ZHENG Cheng-yao;SHAO Chun-bing;HUANG Ding-bo(Shenzhen Energy Technology Co.,Ltd.,Shenzhen 518133,China;Jiangsu Aerospace Hydraulic Equipment Co.,Ltd.,Yangzhou 225600,China;Guangzhou Energy Technology Co.,Ltd.,Guangzhou 510665,China)
出处 《水电能源科学》 北大核心 2020年第12期165-168,共4页 Water Resources and Power
关键词 水力发电 标杆电价 边际分析 装机容量 hydropower generation benchmark generation price marginal analysis installed capacity
  • 相关文献

参考文献2

二级参考文献10

  • 1HOSSEINI S M H, FOROUZBAKHSH F, FOTOUHI M, VAKILIAN M. Determination of Installation Capacity in Reservoir Hydro power Plants Considering Technical, Eeconomical and Reliability Indices[J]. International Journal of Electrical Power & Energy Systems, 2008,30 (6-7) : 393-402.
  • 2HOSSEINI S M H,FOROUZBAKHSH F, VAKILIAN M. Determination of Optimal Installation Capacity of Small Hydropower Plants Considering Technical Economic and Reliability Indices[J]. Energy Policy,2005,33(15) :1948- 1956.
  • 3HOSSEINI S M H,FOROUBAKHSH F,FOTOUHI M,Optimal Installation Capacity of Medium Hydro-power Plants Con- sidering Technical, Economical and Reliability Indices[J].International Journal of Power and Energy Systems, 2008,28 ( 1 ) : 15-22.
  • 4HOSSEINI S M H, FOROUZBAKHSH F, VAKILIAN M. An Approachto the Investment Analysis of Small and Medium Hydro-power Plants[J]. Elsevier Energy Policy Journal,2007,35(2) :1013-1024.
  • 5HOSSEINI S M H, FOROUZBAKHSH F, VAKILIAN M. Economical Analysis of Financing on Medium and Small Hydro Power Plants[C]. 21 Int. Conf. on Hydropower and Dams, Villach, Austria, October, 2005 : 17-20.
  • 6HOSSEINI S M H, FOROUZBAKHSH F, VAKILIAN M. Economical Analysis of Financing on Medium and Small Hydro Power Plants[C]. International Conferences on Hydropower and Dams Villach. Austria,2005,10.
  • 7Energy Ministry of China. Hydro Power Plant Hand Book[S]. Belling:Chinese Standard,2000.
  • 8WU J K. Optimal Electric Energy Production scheduling for Thermal-Hydro Electric Power Systems[J]. Energy and Power Engineering,2009(8) :54 -64.
  • 9WU J K. Optimal Electric Energy Production Scheduling for Thermal Hydro Electric Power Systems[C]. 2009 Asia-pacific Power and Energy Engineering Conference (APPEEC 2009),Wuhan,China,2009.
  • 10吴杰康,陆文玲.基于效益分析的水火电力系统短期优化调度[J].电网技术,2009,33(18):25-31. 被引量:7

共引文献4

同被引文献55

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部