期刊文献+

新建隧道群下穿既有高速公路隧道安全分析及施工保障 被引量:3

Safety Analysis and Construction Guarantee of Newly Built Tunnel Group underneath Passing Existing Highway Tunnel
下载PDF
导出
摘要 基于新建隧道群下穿福州绕城公路东南段董奉山既有隧道工程,运用三维有限元研究新建隧道群施工对既有隧道的影响,分别从爆破和静力施工阶段两个方面进行综合分析。结果表明:新建隧道的开挖进尺控制在1.5 m,最大允许装药量控制在7.54 kg,爆破震速可控制在3 cm/s以内,特大断面隧道群施工对新建隧道的爆破震速在安全可控范围内;既有隧道的最大变形为2.9 mm,围岩主应力的前后变化值为1.50%以内,衬砌应力的最大应力变化值为4.17%,特大断面隧道群施工对新建隧道的影响不大。最后,根据分析结果提出施工期的保障措施。 In this paper,three-dimensional finite element is used to study the influence of new tunnel group construction on the existing tunnel based on the new tunnel group underneath passing the existing Dongfengshan tunnel engineering in the southeast section of Fuzhou ring road.The analysis method is carried out from two aspects of blasting and static construction stage.The results show that in order to make the blasting vibration speed of the new tunnel under the control of large cross-section tunnel group construction within the safe and controllable range,the excavation footage of the new tunnel shall be controlled within 1.5 m,the maximum allowable charge shall be controlled within 7.54 kg,and the blasting vibration speed shall be controlled within 3 cm/s.The maximum deformation of the existing tunnel is 2.9 mm,the change value of the main stress of the surrounding rock is within 1.50%,the change value of the maximum stress of the lining is 4.17%,and the construction of the large cross-section tunnel group has little influence on the new tunnel.Finally,according to the analysis results,the guarantee measures during the construction period are put forward.
作者 洪永佳 HONG Yongjia(Fuzhou Planning Design&Research Institute,Fuzhou 350100,China)
出处 《路基工程》 2020年第6期54-59,共6页 Subgrade Engineering
关键词 隧道群 下穿高速公路隧道 数值分析 爆破震速 变形 应力 tunnel group underpass the highway tunnel numerical analysis blasting vibration deformation stress
  • 相关文献

参考文献8

二级参考文献62

共引文献162

同被引文献18

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部