期刊文献+

马岭水利枢纽集运鱼系统设计研究 被引量:7

Study on the Design of Fish Collection and Transportation System for Maling Hydraulic Project
下载PDF
导出
摘要 马岭水利枢纽位于贵州省马别河峡谷河段,受坝高和地形条件的限制,采用“固定集鱼平台集鱼+公路转运+滑槽放流”的过鱼方案,是国内第一个采用这种过鱼方案的工程。中国电建集团贵阳勘测设计研究院有限公司和四川大学水力学与山区河流开发保护国家重点实验室在鱼类游泳能力测试和水力学模型试验的基础上,对该水利枢纽集鱼系统进行了重点研究,通过工程措施,塑造了诱鱼水力学条件,研究成果可为类似工程过鱼设施的设计提供参考。 Maling Hydraulic Project is located in the valley reach of Mabie River in Guizhou Province.Due to the limitation of dam height and topographic conditions,the fish-passing scheme is determined as the“Fixed fish-collecting platform+Road transfer+Spout releasing”.It is the first project in China to adopt this kind of fish-passing scheme.Based on the tests of fish swimming and the hydraulic model experiments by PowerChina Guiyang Engineering Corporation Limited and The State Key Laboratory of Hydraulics and Mountain River Engineering,the fish collecting system is emphatically researched.By means of engineering measures,the hydraulics conditions of fish attracting are shaped.The results of this study can provide references for the design of similar projects.
作者 王猛 马卫忠 单承康 安瑞冬 姜鹏 李聪 罗思 WANG Meng;MA Weizhong;SHAN Chengkang;AN Ruidong;JIANG Peng;LI Cong;LUO Si(PowerChina Guiyang Engineering Corporation Limited,Guiyang 550081,Guizhou,China;State Key Laboratory of Hydraulics and Mountain River Engineering,Sichuan University,Chengdu 610065,Sichuan,China;Huaiyin Institute of Technology,Huaian 223003,Jiangsu,China)
出处 《水力发电》 2021年第1期7-11,共5页 Water Power
基金 中国电力建设股份有限公司科技项目(DJ-ZDXM-2014-04)。
关键词 集运鱼系统 模型试验 工程设计 马岭水利枢纽 fish collection and transportation system model experiment engineering design Maling Hydraulic Project
  • 相关文献

参考文献3

二级参考文献7

共引文献22

同被引文献78

引证文献7

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部