摘要
生态文明建设与产业结构调整相互影响。构建面板向量自回归模型(PVAR)和面板误差修正模型(PECM)分析了2000—2017年山东省17个城市生态文明建设与产业结构调整之间的互动关系。结果表明,山东省生态文明建设与产业结构调整之间存在良性互动响应机制,生态文明建设对产业结构调整的响应稍弱于产业结构调整对生态文明建设的响应;相对于长期均衡点,生态文明建设的短期调节速度慢于产业结构调整的短期调节速度。山东省应以生态文明建设考核目标为导向,积极引导产业结构调整;大力发展生态产业园;因城施策,打造生态文明建设与产业结构调整深度互动新模式,充分发挥生态文明建设与产业结构调整相互促进的交互作用。
Ecological civilization construction and industrial structure change affect each other.The panel vector autoregression model(PVAR)and panel error correction model(PECM)were constructed to analyze the interaction between ecological civilization construction and industrial structure change in 17 cities of Shandong province from 2000 to 2017.The results show that there is an interactive response mechanism between ecological civilization construction and industrial structure change in Shandong province;The response degree of ecological civilization construction to industrial structure change is slightly weaker than that of industrial structure change to ecological civilization construction;Relative to the long-term equilibrium point,the short-term change speed of ecological civilization construction is slower than that of industrial structure change.Shandong province should adjust industrial structure according to assessment targets of ecological civilization construction,vigorously develop eco-industrial parks,and implement different policies in different cities to create a new mode of deep interaction between ecological civilization construction and industrial structure change,give full play to the interaction between ecological civilization construction and industrial structure change.
作者
陈东景
张然
翟晓东
CHEN Dongjing;ZHANG Ran;ZHAI Xiaodong(Economic School,Qingdao University,Qingdao 266061,Shandong,China;Business School,Qingdao University,Qingdao 266061,Shandong,China)
出处
《中南林业科技大学学报(社会科学版)》
2020年第6期32-38,共7页
Journal of Central South University of Forestry & Technology(Social Sciences)
基金
山东省社科规划项目“新时代山东省产业转型升级与生态文明建设融合发展研究”(18CJJJ32)
青岛市社科规划项目“青岛市生态文明建设与产业结构转型升级协调发展研究”(QDSKL2001064)。
关键词
生态文明建设
产业结构调整
互动响应机制
ecological civilization construction
industrial structure change
interactive response mechanism