期刊文献+

Study on wellbore temperature of riserless mud recovery system by CFD approach and numerical calculation 被引量:3

原文传递
导出
摘要 The riserless mud recovery(RMR)system abandons the riser used in conventional offshore drilling,and the drill string above the seabed is directly exposed to seawater,resulting in convective heat transfer from the drilling fluid in the drill string to seawater.Therefore,the wellbore temperature distribution in the RMR system is quite different from the conventional offshore drilling.In this paper,based on the heat transfer characteristics of the RMR system,a mathematical model of the thermal field of the RMR system is established.The data used in this paper come from a vertical well in the South China Sea.Computational Fluid Dynamics(CFD)software is used to simulate the temperature distribution in drill string at different seawater depths and different formation depths in this paper,and the simulation results are compared with the calculation results of the mathematical model,so as to verify the feasibility of the mathematical model established in this paper.Combined with the calculation results of the mathematical model,this paper also explores the effect of different discharge capacity and different injection temperature of drilling fluid on the wellbore temperature change.
出处 《Petroleum》 CSCD 2020年第2期163-169,共7页 油气(英文)
基金 The financial support from the Natural Science Foundation of China(NSFC)(No.51274168) the National Key R&D Program of China(No.2018YFC0310202)is gratefully acknowledged。
  • 相关文献

参考文献1

二级参考文献15

  • 1许亮斌,蒋世全,殷志明,陈国明.双梯度钻井技术原理研究[J].中国海上油气(工程),2005,17(4):260-264. 被引量:20
  • 2陈国明,殷志明,许亮斌,蒋世全.深水双梯度钻井技术研究进展[J].石油勘探与开发,2007,34(2):246-251. 被引量:64
  • 3Shaughnessy J,Daugherty W. More ultradeepwater drilling problems[SPE/IADC 105792][R].2007.
  • 4Salama M M. Some challenges and innovations for deep-water developments[OTC 8455][R].1997.
  • 5Cohen J H,Kleppe J. Gulf of Mexico' s first application of riserless mud recovery for top-hole drilling--a case study[OTC 20939-MS][R].2010.
  • 6Brown J D,Urvant V V. Deployment of a riserless mud recovery system offshore Sakhalin Island[SPE 105212-MS][R].2007.
  • 7Stave R. Demonstration and qualification of a riserless dual gradient system[OTC 17665-MS][R].2005.
  • 8Hinton A. BP egypt uses RMR on a jack-up to solve a top hole drilling problem[SPE 19815-MS][R].2009.
  • 9Froyen J. Riserless mud recovery (RMR) system evaluation for top hole drilling with shallow gas[SPE 102579-MS][R].2006.
  • 10Smith D,Winters W. Deepwater riserless mud return system for dual gradient tophole drilling[SPE 130308][R].

共引文献6

同被引文献21

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部