期刊文献+

Trimble RTX后处理在填海验收测量中的应用 被引量:1

Application of Trimble RTX Post-processing in the Reclamation Acceptance Survey
下载PDF
导出
摘要 为探究Trimble RTX后处理(RTX-PP)用于海洋测绘领域填海验收测量的可行性,以港珠澳大桥项目东人工岛、西人工岛为例,利用RTX-PP技术在线解算控制点ITRF2014框架当前历元坐标,通过历元转换及框架变换得到控制点2000国家大地坐标系(CGCS 2000)坐标,与静态解算成果对比,点位精度不超过±0.05 m,满足规范要求。表明RTX-PP可应用于填海验收平面控制点测量。 In order to explore the feasibility of Trimble RTX post-processing(RTX-PP) used in marine surveying field reclamation acceptance survey,taking the east artificial island and west artificial island of the Hong KongZhuhai-Macao Bridge project as examples,the RTX-PP technology was used to solve the current epoch coordinates of control points ITRF2014 frame online,and the CGCS 2000 coordinates of control points were obtained through epoch conversion and frame transformation.Compared with the static calculation results,the point accuracy did not exceed±0.05 m,which met the requirements of the specification.It shows that RTX-PP can be applied to the acceptance plane control measurement of completed sea area of the reclamation projects.
作者 柯敏 温华 刘昔 刘亮 KE Min;WEN Hua;LIU Xi;LIU Liang(Tianjin Research Institute for Water Transport Engineering,Tianjin 300456,China;Tianjin Survey and Design Institute for Water Transport Engineering,Tianjin Key Laboratory of Surveying and Mapping for Waterway Transport Engineering,Tianjin 300456,China;Hong Kong-Zhuhai-Macao Bridge Authority,Zhuhai 519060,China)
出处 《海洋测绘》 CSCD 2020年第6期70-73,共4页 Hydrographic Surveying and Charting
基金 天津市科技计划创新平台与人才专项(16PTSYJC00190) 中央级公益性科研院所基本科研业务费专项基金(TKS180405)。
关键词 海洋测绘 填海验收测量 RTX后处理 坐标转换 2000国家大地坐标系 marine surveying reclamation acceptance survey RTX-PP coordinate convert CGCS 2000
  • 相关文献

参考文献12

二级参考文献90

共引文献177

同被引文献16

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部