摘要
目前我国升鱼机的设计和研究还没有相应的规程规范,对乌弄龙水电站升鱼机金属结构设备的选型、布置及设计的思路和方法进行介绍,重点阐述了诱捕鱼系统和运输过坝系统设备布置、运行流程、设计参数及结构特点。目前设备安装调试已完成并投入运行,运行效果好。
At present,there are no corresponding codes and specifications for the design and research of fish hoist in China.This paper introduces the selection,arrangement and design ideas and methods of metal structure equipment of fish hoist in Wulonglong Hydropower Station,and focuses on the arrangement of equipment,operation process,design parameters and structural characteristics of the trapping and transporting system.At present,the equipment installation and commissioning has been completed and put into operation with good operation effect.
作者
黄伟
占乐军
雷宝民
HUANG Wei;ZHAN Le-jun;LEI Bao-ming(Huaneng Lancang River Hydropower Co.,LTD.,Wulonglong and Lidi Hydropower Engineering Construction Administration,Weixi 674606,China)
出处
《云南水力发电》
2021年第2期85-88,共4页
Yunnan Water Power