摘要
为充分发挥流域水能资源综合利用,实现经济效益最大化,2015年乌江公司梯级水电站实施“远程集控”运行管理模式。在传统模式向远程集控模式过渡中,由于存在一些问题,远程操作不安全事件偶有发生。乌江集控中心根据远程操作的实际情况,针对存在的问题,经过深入分析,制定相应的措施进行深化管理,取得的成效显著。
In order to give full play to the comprehensive utilization of hydropower resources in the basin and maximize the economic benefits,the cascade hydropower stations of wujiang Company implemented the remote centralized control operation management mode in 2015.In the transition from traditional mode to remote centralized control mode,due to some problems,remote operation unsafe events occasionally occur.According to the actual situation of remote operation,aiming at the existing problems,through in-depth analysis,Wujiang Centralized Control Center formulated corresponding measures to deepen the management,and achieved remarkable results.
作者
龙潭
LONG Tan(Hydropower Station Remote Centralized Control Center of Guizhou wujiang Hydropower Development Co.,Ltd,Guiyang,Guizhou,550002)
出处
《红水河》
2021年第1期89-92,共4页
Hongshui River
关键词
梯级水电站
远程集控
操作安全
管理
实践
hydropower station in cascade
remote centralized control
operation safety
management
practice