二氧化碳预裂爆破强制放顶技术在塔山煤矿的应用 被引量:4

The application of carbon dioxide pre-splitting blasting forced roof caving technology in Tashan Coal Mine
下载PDF
导出
摘要 塔山煤矿为防止8116工作面在初采期间老顶初次折断距离较大,确保初采期间古塘悬板及时垮落,在切眼采煤侧施工二氧化碳致裂钻孔,采用二氧化碳预裂爆破强制放顶技术破坏其完整性,使其提前垮落。应用效果表明,该技术能够从根本上解决了综放工作面在初采期间老顶集中垮落造成了强矿压显现问题及瓦斯异常涌出问题。 In Tashan Coal Mine,in order to prevent the large initial breaking distance of the old roof during the initial mining of the 8116 working face,and to ensure that the ancient tang suspension slab collapses in time during the initial mining,a carbon dioxide cracking hole is constructed on the coal side of the off-cut,and carbon dioxide pre-cracking is used.Blasting forced roofing technology destroys its integrity and causes it to collapse prematurely.The application effect shows that the technology can fundamentally solve the problem of strong underground pressure and abnormal gas emission caused by the concentrated collapse of the old roof during the initial mining of the fully mechanized caving face.
作者 贺振金 HE Zhenjin(Tashan Coal Mine of Datong Coal Group,Datong037000,China)
出处 《煤矿现代化》 2021年第2期122-123,126,共3页 Coal Mine Modernization
关键词 二氧化碳 预裂爆破 致裂钻孔 放顶 老顶 carbon dioxide pre-splitting blasting fracture drilling caving old roof
  • 相关文献

参考文献5

二级参考文献24

共引文献50

同被引文献32

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部