摘要
依托某公共设施(A1塔楼)项目,对超高层多方向变截面爬模方案进行优化,形成以整体平移为核心的多方向变截面爬模改造施工技术,解决爬模高空改造速度慢、效率低的问题,最大限度降低了爬模改造对主体施工进度的影响,加快了施工进度。
The public facilities(A1 tower)project adopts multi-directional variable-section climbing formwork.The climbing formwork of the super high-rise is optimized to form the construction technology with the overall translation as the core,which solves the shortcomings of the slow speed and low efficiency of transformation of climbing formwork at high altitude.The influence of climbing formwork modification on the main construction progress is reduced,and the construction progress is accelerated.
作者
张高文
王文云
黄易平
张泽峰
蔡志立
ZHANG Gaowen;WANG Wenyun;HUANG Yiping;ZHANG Zefeng;CAI Zhili(The 3rd Construction Co.,Ltd.of China Construction 5th Engineering Bureau,Changsha,Hunan 410004,China)
出处
《施工技术》
CAS
2021年第2期60-62,共3页
Construction Technology
关键词
高层建筑
整体平移
变截面
爬模
施工技术
tall buildings
overall translation
variable cross-section
climbing formwork
construction