期刊文献+

大型水电站主设单位开拓移民工程总承包业务探讨

Business Analysis of the General Contracting of Resettlement Projects for Main Design Institute of Large Hydropower Stations
下载PDF
导出
摘要 通过分析大型水电站主设单位开拓移民工程总承包业务的优劣势,提出由主设单位担当相关移民工程总承包者的可行性和必要性,从而为设计单位开拓类似工程总承包者市场提供参考,为加快传统设计单位向科技型工程公司转型升级步伐助力。 Based on the analysis of the advantages and disadvantages of the main design institute of large hydropower station in developing the general contracting business of hydropower resettlement project,this paper puts forward the feasibility and necessity analysis so as to put forward suggestions for the main design institute to further develop the general contracting business of other specialties,and speed up the pace of upgrading and transforming the traditional design institute to a scientific and technological engineering company.
作者 吴晓涛 WU Xiao-tao(Guangdong Hydropower Planning&Design Institute Co.,Ltd.,Guangzhou 510635,China)
出处 《广东水利电力职业技术学院学报》 2021年第1期35-37,共3页 Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
关键词 主设单位 水电移民工程 总承包 the main design institute resettlement projects general contracting
  • 相关文献

二级参考文献17

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部