以付村矿3_(上)1007综采工作面实际情况为背景,对综采工作面快速回撤工艺进行了相关研究,通过优化回撤流程,实现了工作面的高效、快速、安全回撤。
Based on the actual situation of the 3_(upper)1007 fully mechanized working face in Fucun Coal Mine,the rapid withdrawal process of fully mechanized working face is studied.By optimizing the withdrawal process,the efficient,rapid and safe withdrawal of working face is realized.
作者
徐涛
朱思润
Xu Tao;Zhu Sirun(Zaozhuang Mining Group Fucun Coal Industry Co.,Ltd.,Shandong Jining 277600)
出处
《山东煤炭科技》
2021年第3期111-113,共3页
Shandong Coal Science and Technology
关键词
综采工作面
设备回撤
工艺优化
fully mechanized mining face
equipment withdrawal
process optimization