期刊文献+

南通轨道交通换乘枢纽青年路站BIM技术应用 被引量:1

Application of BIM in Qingnianlu Station of Nantong Metro Transfer Station
下载PDF
导出
摘要 随着城市轨道交通建设进入快速发展期,轨道交通工程的设计工作面临着更多的困难和挑战,因此,采用先进的设计理念和方法十分重要。建筑信息模型(BIM)技术作为基础设施行业的全新技术,目前已逐渐被应用到轨道交通工程设计阶段的工作中。简要介绍BIM技术的特点和该技术在轨道交通领域的应用现状;结合南通轨道交通1、2号线同期实施换乘车站青年路站案例,阐述BIM技术在轨道交通工程设计阶段的应用流程,并介绍几项关键技术研究工作,展望BIM技术在轨道交通工程领域的应用前景。 With the fast development of urban rail transit construction,rail transit engineering design is facing more difficulties and challenges.It’s very important to adopt advanced design concepts and methods.As a new technology in infrastructure industry,BIM has been gradually applied to the work of rail transit engineering design stage.Briefly introduces the characteristics of BIM technology and its application status in the field of rail transit.Based on the case of the design and application of the Qingnianlu Station of Nantong Metro Line 1,expounds the application process of BIM technology in the design stage of rail transit engineering,and introduces several key technical research works.Finally,the prospect of BIM technology in the field of rail transit engineering is prospected.
作者 汪其超 王涛 刘捷 赵俊 WANG Qichao;WANG Tao;LIU Jie;ZHAO Jun(China Design Group Co.,Ltd.,Nanjing 210014,China;School of Earth Science and Engineering,Nanjing University,Nanjing 210046,China)
出处 《现代交通技术》 2021年第1期73-78,共6页 Modern Transportation Technology
关键词 BIM技术 轨道交通工程设计 应用流程 关键技术 BIM(building information modeling) engineering design of rail application process key technologies
  • 相关文献

参考文献12

二级参考文献76

共引文献1193

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部