800 t船坞龙门吊主梁的预拱设计与建造

Girder Camber Design and Construction of 800 t Dock Gantry Crane
下载PDF
导出
摘要 结合800 t船坞龙门吊的建造,为解决建造过程中的实际问题,给出主梁的预拱设计方法。为保证主梁建造质量,确立主梁分段的建造工艺,并针对一些具体问题提出处理办法,以保证主梁建造精度。在龙门吊完工后,进行不同工况下的拱度测量以检验建造精度。实测值同设计值较为接近,表明所采用的建造工艺是可靠的,可为类似大型龙门吊的建造提供参考。 Combined with the construction of 800 t dock gantry crane,in order to solve the practical problems during the construction,the girder camber design method is given.In order to ensure the girder construction quality,the construction technology of girder section is established,and the treatment methods are proposed for some specific problems to ensure the girder construction precision.After the gantry crane is completed,the camber measurements under different working conditions are taken to check the construction precision.The measured values are close to the designed values,which indicates that the construction technology adopted is reliable and can provide reference for the construction of similar large gantry crane.
作者 李冬明 沈位军 袁爱东 沈旭东 LI Dongming;SHEN Weijun;YUAN Aidong;SHEN Xudong(Hudong-Zhonghua Shipbuilding(Group)Co.,Ltd.,Shanghai 200129,China)
出处 《造船技术》 2021年第2期33-36,共4页
关键词 船坞龙门吊 主梁 预拱设计 精度控制 dock gantry crane girder camber design precision control
  • 相关文献

参考文献6

二级参考文献14

  • 1李堃.现代造船工程[M].哈尔滨:哈尔滨工程大学出版社,1998.
  • 2GB/T3811-2008起重机设计规范[S].北京:中国标准出版社,2008.
  • 3徐格宁.机械装配金属结构设计[M].北京:机械工业出版社,2009.
  • 4国家技术监督局.GB/T14406---93通用门式起重机[S].北京:中国标准出版社,1994.
  • 5中华人民共和国国家质量监督检验检疫总局.TSGT7001-2009,电梯监督检验和定期检验规则一曳引与强制驱动电梯[S].北京:新华出版社,2010.
  • 6全国电梯标准化技术委员会.GB7588-2003,电梯制造与安装安全规范[S].北京:中国标准出版社,2003.
  • 7全国电梯标准化技术委员会.GB7588-1995电梯制造与安装安全规范[S].北京:中国标准出版社,1995.
  • 8S120驱动器&伺服电机选型手册,2008.01.
  • 9S1MATICWinCC产品概览.
  • 10王贯山,刘世岩.电梯制动距离探讨及其检测装置[J].安装,2007(12):23-24. 被引量:7

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部