期刊文献+

全过程造价管理在污水处理厂建设中的运用分析 被引量:3

Analysis on the Application of Whole Process Cost Management in the Construction of Sewage Treatment Plant
下载PDF
导出
摘要 受到污水排放量增加的影响,污水厂的工作量也随之增加。为有效维持自然生态发展,应切实提高污水处理质量,对污水厂进行造价升级,提高水质处理能力,有利于控制环境破坏情况。论文以某污水处理厂建设为例,从多个方面对该厂的造价管理进行分析,以供参考。 Affected by the increase of sewage discharge,the workload of sewage treatment plant also increases accordingly.In order to effectively maintain the development of natural ecology,we should effectively improve the quality of sewage treatment,upgrade the cost of sewage treatment plants,improve the water quality treatment capacity,and help to control the environmental damage.Taking the construction of a sewage treatment plant as an example,this paper analyzes the cost management of the plant from many aspects for reference.
作者 丘建华 QIU Jian-hua(China railway Shanghai Engineering Bureau Group Municipal Environmental Protection Engineering Co.Ltd.,Shanghai 200333,China)
出处 《工程建设与设计》 2021年第8期170-172,共3页 Construction & Design for Engineering
关键词 全过程造价管理 污水处理厂 污水排放量 whole process cost management sewage treatment plant sewage discharge
  • 相关文献

参考文献3

二级参考文献10

共引文献8

同被引文献12

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部