期刊文献+

影响煤矿巷道掘进速度的因素分析及解决对策研究 被引量:2

Analysis of Factors Affecting the Tunneling Speed of Coal Mine Roadway and Study on Countermeasures
下载PDF
导出
摘要 为提高煤矿巷道掘进速度,解决工作面接替紧张的问题,基于潞安集团某矿实际工程概况,从多方面着手分析了影响煤矿巷道掘进速度的因素,提出了一些提高巷道掘进速度的对策,实际应用结果表明,通过综合应用这些对策,不仅能有效提高巷道掘进速度,而且巷道成型效果更好,能更好的缓解采煤工作面接替紧张的问题。 In order to improve the tunneling speed of coal mine and solve the problem of tight succession in working face,based on the actual engineering situation of a mine in Lu’an Group,this paper analyzes the factors affecting the tunneling speed of coal mine from various aspects,and puts forward some countermeasures to improve the tunneling speed.The practical application results show that comprehensive application of these countermeasures can not only effectively improve the tunneling speed,but also achieve better roadway forming effect,which can better alleviate the tight succession problem in coal mining face.
作者 秦会锦 Qin Huijin(Yuwu Coal Industry Co.,Ltd.,Shanxi Lu'an Group,Shanxi,046199)
出处 《当代化工研究》 2021年第12期86-87,共2页 Modern Chemical Research
关键词 煤矿巷道 掘进速度 影响因素 对策 coal mine roadway tunneling speed influencing factors countermeasures
  • 相关文献

参考文献3

二级参考文献22

共引文献27

同被引文献13

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部