桩锚支护体系超期服役安全评估方法与实例分析 被引量:2

Safety Evaluation Method and Case Analysis of Soldier Pile and Ground Anchor Retaining Structure in the Extended Service
原文传递
导出
摘要 基坑支护结构作为一种临时性围护体系,设计使用年限一般为1~2年,而很多深基坑支护工程往往存在超期服役的现象。对于超期后如何界定其安全性、如何确定加固方案或持续使用期限,目前并尚无技术标准进行判定。依托某实际超期基坑工程,从支护结构实体检测、鉴定与变形监测数据分析的角度出发,结合支护结构计算、数值模拟的手段,总结出一套适用于桩锚结构超期评估的思路与方法,旨在为类似工程提供参考。 As a temporary retaining system,the design service life of the deep excavation support structure is generally 1~2 years,however,many excavation supporting projects often have undertaken the extended service.At present,there is no technical specification to determine how to define the safety of the supporting structure,how to determine the reinforcement scheme or the supporting structure sustained service life after the expiration date.Based on an actual overdue foundation pit project,from the perspective of supporting structure entity detection,identification and deformation monitoring data analysis,combined with supporting structure calculation and numerical simulation,this paper summarizes a set of ideas and methods suitable for overdue evaluation of pile anchor structure,which is intended to provide reference for similar projects.
作者 童寅 王鑫 TONG Yin;WANG Xin(Changsha Planning&Design Institute Co.,Ltd.,Changsha 410007;BGI Engineering Consultants Ltd.,Beijing 100038)
出处 《土工基础》 2021年第3期297-301,337,共6页 Soil Engineering and Foundation
关键词 深基坑 设计使用年限 超期服役 结构鉴定 安全评估 Deep Excavation Design Service Life Extended Service Structure Inspection Safety Assessment
  • 相关文献

同被引文献3

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部