摘要
通过对国内EPC项目招标时点的研究和两阶段设计利益相关者的分析,揭示设计管理存在的利益悖论。基于价值共创理论构建DART-PDCA模型,给出两阶段设计管理中存在的利益悖论问题的相应对策建议,实现业主和总承包商的合作共赢。
This paper reveals the interest paradox in design management by researching the bidding time of domestic EPC projects and analyzing the two-stage design stakeholder.Based on the theory of value co-creation,constructs the DART-PDCA model,and gives corresponding countermeasures and suggestions for the benefit paradox existing in the two-stage design management,so as to realize the win-win cooperation between the owner and the general contractor.
作者
龙亮
李芬
尹贻林
李孝林
于晓田
LONG Liang;LI Fen;YIN Yilin;LI Xiaolin;YU Xiaotian(School of Economics and Management,Guizhou Institute of Technology,Guiyang 550003,China;Tianjin University of Technology,Tianjin 300384,China;Tianjin Fanya Engineering Mechanic&Electronic Facilities Consulting Co.,Ltd,Tianjin 300202,China)
出处
《建筑经济》
北大核心
2021年第7期40-44,共5页
Construction Economy
基金
贵州省本科高校一流团队建设项目(YLDX201704)
贵州省本科高校一流教学平台建设项目(YLDX201608)
贵州省本科高校一流课程建设项目(YLDX201713)
贵州理工学院教改项目(2015QNXM02)
贵州理工学院高层次人才项目(XJGC20190935)。