期刊文献+

综采工作面通过较大断层方法探讨 被引量:3

Discussion on Method of Crossing Large Fault at Fully-mechanized Working Face
下载PDF
导出
摘要 松峪煤业XV1302工作面回采期间通过大小断层共计6条,其中较为复杂的断层为FJ2正断层,断层落差达12 m,通过分析探讨,如采用“施工绕道甩构造”的方法,施工难度较高,耗费成本预计较大,而采取“浅截深、快拉架、速打护帮板”以及“对三角区采取挑木料支护的方式控制顶帮”的方式快速通过,缩短了施工时间,节约了成本,为类似工作面过断层积累了经验。 In view of the complexity and large drop of six faults in mining proces at XV1302 working face of Songyu Coal Industry Co.,Ltd.,the author propose the method of crossing the faults rapidly with shallow cutting depth,rapid shelf and side guard board setting,and top slope control by wood support in triangle zone,which can shorten the construction period,save the cost,providing the experience for crossing fault at similar working face.
作者 许锡军 Xu Xijun(Jinsheng Songyu Coal Industry Co.,Ltd.,Jincheng Anthracite Mining Group Co.,Jincheng,Shanxi 048000)
出处 《江西煤炭科技》 2021年第3期86-88,共3页 Jiangxi Coal Science & Technology
关键词 综采工作面 过断层 措施 效果 fully mechanized working face crossing fault measure effect
  • 相关文献

参考文献5

二级参考文献7

共引文献33

同被引文献10

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部