煤矿巷道掘进速度影响因素与对策研究 被引量:5

Study on Influencing Factors and Countermeasures of Coal Mine Roadway Driving Speed
下载PDF
导出
摘要 采掘接替紧张是困扰煤矿高产的技术难题,其解决的关键在于实现煤矿巷道的快速掘进。通过分析影响煤矿巷道掘进速度的因素,探讨了改善煤矿巷道掘进速度的对策,可以为实现煤矿巷道的快速掘进提供一定的参考。 The tension of mining and excavation replacement is a technical problem that perplexes the high yield of the coal mine,and the key to solve it is to realize the rapid excavation of coal mine roadway.Through the analysis of the factors affecting the driving speed of coal mine roadways,this paper discussed the countermeasures to improve the driving speed of coal mine roadways,which can provide a certain reference for the realization of the rapid driving of the coal mine roadways.
作者 崔柏龙 CUI Bailong(Sihou Coal Mine,Jinneng Holding Coal Industry Group,Yangcheng 048100,Shanxi,China)
出处 《能源与节能》 2021年第7期48-49,共2页 Energy and Energy Conservation
关键词 采掘接替 巷道掘进 掘进速度 mining and excavation replacement roadway excavation driving speed
  • 相关文献

参考文献5

二级参考文献13

共引文献13

同被引文献22

引证文献5

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部