全地下式污水处理厂主体结构设计 被引量:2

Main Structure Design of Fully Underground Sewage Treatment Plant
下载PDF
导出
摘要 全地下式污水处理厂结构空间布置和受力均较复杂,且为超长结构。以西安市某全地下式污水处理厂为背景,从内力分析、有限元模型建立、荷载取值和工况组合等方面简述了其主体结构设计过程,分析了底板和外壁的计算结果,并简述了超长混凝土结构及其抗裂防腐设计。全地下式污水处理厂在我国具有良好的发展前景,该设计实例可为类似工程提供参考。 The underground sewage treatment plant is a super long structure whose structure space layout and stress are complex. Taking a fully underground sewage treatment plant as an example, its’ main structure design process was introduced from the aspects of internal force analysis, finite element model establishment, load value and working condition combination. The calculation results of the baseplate and outer wall were analyzed. And super long structure, anti-corrosion and anti-crack design were outlined. Fully underground sewage treatment plant develops well in China. The design provides reference for similar projects.
作者 张亚平 丁战峰 Zhang Yaping;Ding Zhanfeng(China Municipal Engineering Northwest Design and Research Institute Co.tLtd.,Lanzhou 730000,China)
出处 《市政技术》 2021年第8期134-137,共4页 Journal of Municipal Technology
关键词 全地下式污水处理厂 超长结构 内力分析 有限元模型 荷载取值 fully underground sewage treatment plant super long structure internal force analysis finite element model load value
  • 相关文献

参考文献5

二级参考文献18

共引文献42

同被引文献12

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部