摘要 同舟煤业露天矿为解决建设初期施工人员及机电设备不足的问题,采用土方剥离工程全外委的经营方式。结合同舟煤业的具体情况,分析了工程外委施工存在的七方面主要问题,针对这些问题,给出了露天煤矿外委施工安全管理的针对性措施,在实际应用的过程中具有良好的效果。 In order to solve the problem of shortage of construction personnel and mechanical and electrical equipment at the initial stage of construction,Tongzhou Coal Open-pit Mine adopts the management mode of the whole external committee of the earthwork stripping project.Combined with the specific situation of Tongzhou Coal Industry,this paper analyzes the seven main problems existing in the external construction of the project,and in view of these problems,puts forward the targeted measures for the safety management of the external construction of open-pit coal mine,which has a good effect in the process of practical application.
作者 张文建 Zhang Wenjian(Datong Coal Mine Group Xinzhou Tongzhou Coal Industry Co.,Ltd.,Shanxi Xinzhou 036600)
出处 《山东煤炭科技》 2021年第9期225-227,共3页 Shandong Coal Science and Technology
关键词 露天煤矿 外委工程 安全管理 open-pit coal mine outsourced project safety management
  • 相关文献

参考文献8

二级参考文献40

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部