小型反铲在梅蓄电站引水上竖井扒渣过程中的应用 被引量:1

Application of Small Backhoe in Slag Removal Process of Water Diversion Shaft of Meixu Hydropower Station
下载PDF
导出
摘要 根据以往施工经验,钻孔爆破、扒渣、支护为竖井开挖单循环进尺主要作业工序,其中扒渣作业一般采用人工扒渣,是3项作业中工人劳动强度最大、安全隐患最多的工序。为降低工人劳动强度、提高扒渣效率,梅蓄电站引水竖井二次扩挖引入小型挖掘机进行机械扒渣作业,有效提高了竖井成井速度,降低工人劳动强度,为梅蓄电站按照目标节点完成起到了一定的促进作用。 According to past construction experience,borehole blasting,slag removal and support are the main working procedures of single-cycle footage feeding for shaft excavation.In general,slag removal is a process with the highest labor intensity and the most potential safety hazards among the three operations.In order to reduce the labor intensity of workers and improve the efficiency of slag picking,the secondary expansion of diversion shaft of Meixu Hydropower Station is introduced into small excavator to carry out mechanical slag picking operation,which effectively improves the speed of shaft completion and reduces the labor intensity of workers,and plays a certain role in promoting completion of Meixu Hydropower Station according to target node.
作者 张国红 毕晓伟 杨振生 ZHANG Guo-hong;BI Xiao-wei;YANG Zhen-sheng(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处 《云南水力发电》 2021年第10期135-138,共4页 Yunnan Water Power
关键词 提升系统布置 挖掘机 扒渣 风险分析 lifting system layout excavator slag removal risk analysis
  • 相关文献

参考文献6

二级参考文献20

共引文献20

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部