期刊文献+

地铁车辆检修断、送电作业流程管理系统

Workflow Management System of Catenary Power Cut-off and Transmission in Metro Train Maintenance
下载PDF
导出
摘要 对地铁车辆车顶设备进行检修时,需进行断、送电作业,针对目前断、送电作业流程中存在的问题及安全,设计开发了地铁车辆检修断、送电作业流程管理系统。介绍了该系统的设计目的、设计原则、总体方案和系统组成。阐述了基于该系统的断、送电作业流程。有效提升车辆车顶设备检修断、送电作业流程安全管控的防错等级,可使车辆检修作业更安全、更可靠。 During the maintenance of metro train roof platform,it is necessary to carry out power cut-off and transmission operation.In view of the existing problems and hidden dangers in the operation,a new power cut-off and transmission process management system is designed and practiced.In this paper,the design purpose,principle,overall scheme and system composition are introduced,the power cut-off and transmission process of the system are described.This system can effectively improve the error proofing level of the safety management and control process of the roof equipment maintenance,power transmission process,make the maintenance and train maintenance operation safer and more reliable.
作者 戚斌 许学平 QI Bin;XU Xueping(Vehicle Branch of Shanghai Metro Maintenance Support Co.,Ltd.,200030,Shanghai,China)
出处 《城市轨道交通研究》 北大核心 2021年第S01期141-145,共5页 Urban Mass Transit
关键词 地铁 车辆检修 接触网断电 接触网送电 metro vehicle maintenance catenary power cut-off catenary power transmission
  • 相关文献

参考文献1

二级参考文献2

  • 1珠海市共创有限公司.深圳地铁一期工程竹子林车辆段 FY2000U型微机防误闭锁系统[Z].珠海:珠海市共创有限公司,2004.
  • 2珠海市共创有限公司.南京地铁一号线工程FY2000型微机防误闭锁系统[Z].珠海:珠海市共创有限公司,2004.

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部