卡洛特水电站装机容量为72万kW,是“中巴经济走廊”水电投资项目,电站主变压器各项技术指标、参数的选择以及制造、运输、安装方案的确定等应满足其环境要求。介绍了卡洛特水电站概况、电气主接线方案,通过对交通运输情况的分析,选出适合该工程的主变压器设备。最后结合工程枢纽布置、厂房布置,对所选变压器进行了合理的布置设计。
Kalot Hydropower Station,with installation capacity of 72×10^(4) kW,is first hydropower investment proj⁃ect in the"China-Pakistan Economic Corridor",so the higher request is put forward to the various specifications,parameters the manufacture,transportation,installation of main transformer,etc..This paper introduces the general situation of Karot Hydropower Station and the key single line diagram,and by analyzing the traffic and transporta⁃tion conditions,selects the main transformer equipment for the project.Finally,combined with the layout of the proj⁃ect and powerhouse,a reasonable layout design of the selected transformer is carried out.
作者
徐则诚
王树清
董晓宁
XU Zecheng;WANG Shuqing;DONG Xiaoning(Changjiang Survey,Planning,Design and Research Co.,Ltd.,Wuhan 430010,China)
出处
《水利水电快报》
2021年第11期80-83,共4页
Express Water Resources & Hydropower Information
关键词
主变压器
单相变压器
卡洛特水电站
巴基斯坦
main transformer
single-phase transformer
Karot Hydropower Station
Pakistan