期刊文献+

基坑施工对下卧地铁隧道影响与控制措施 被引量:7

Influence and Control Measures of Foundation Pit Construction on Lower Sleeper Subway Tunnel
下载PDF
导出
摘要 以广州某地铁项目为背景,提出了基坑围护桩基施工对下卧地铁矿山法隧道的锚杆和围岩的扰动;上部明挖基坑的开挖,导致下卧地铁隧道的隆降。为了研究基坑施工期间对下卧地铁隧道结构的影响,通过计算和数值分析,评估施工存在的风险,并采取了控制围护桩桩长和施工工艺、明挖基坑“分段、分层、先撑后挖”的原则控制地铁隧道变形,项目取得了良好效果。可为以后类似工程实施提供参考。 In the background of a subway project in Guangzhou,the disturbance of the anchor rod and surrounding rock in the tunnel.In order to study the impact of foundation pit construction on the structure of the underground subway tunnel,evaluate the existence of construction risks through calculation and numerical analysis,and adopt the principle of controlling the length of retaining pile and construction technology,digging the foundation pit“segmentation,stratification,first support before excavation”,the project has achieved good results.Can provide reference for the future implementation of similar projects.
作者 林启明 LIN Qiming(Guangzhou Development Zone Financial Investment Construction Project Management Center Guangzhou 510663,China)
出处 《广东土木与建筑》 2021年第11期66-69,共4页 Guangdong Architecture Civil Engineering
关键词 基坑 隧道 桩长 控制措施 数值分析 foundation pit tunnel pile length control measures numerical analysis
  • 相关文献

参考文献11

二级参考文献65

共引文献438

同被引文献44

引证文献7

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部