常峪铁矿反井钻机与钻爆法联合成井实践 被引量:1

Practise of Combined Well Completion of Changyu Iron Ore Reverse Well Drilling Machine and Drilling and Explosive Method
下载PDF
导出
摘要 基建及生产矿山,在天井掘进施工时,曾采用过普通法成井、吊罐法成井、反井钻机法成井,但存在安全隐患多,成井速度慢,劳动强度大,施工成本高等问题。为此常峪铁矿综合吊罐法、反井钻机法成井的特点,采用反井钻机与钻爆法联合成井方法,克服上述问题,从而提高施工效率和安全效益。 In the course of infrastructure and mining production,during patio excavation construction,it has been adopted with common method well completion,suspended bulkhead raising method well completion,reverse well drilling machine well completion,but problems exist as of great number of potential safety hazard,slow speed of well completion,large labor intensity and high construction costs.Therefore,Changyu Iron Ore Co.will comprehensively consider the features of suspended bulkhead raising method well completion and reverse well drilling machine well completion,and adopt the combined well completion method of reverse well drilling machine and drilling and explosive method,and the above problem will be overcome,and construction efficiency and safety result will be improved.
作者 王宝文 杨闯 李成斌 WANG Baowen;YANG Chuang;LI Chengbin(Luan County Changyu Iron ore Co., Ltd of Hegang Mining Group, Luan County 063700,China)
出处 《矿业工程》 CAS 2021年第6期64-66,70,共4页 Mining Engineering
关键词 反井钻机 钻爆法 联合 天井 reverse well drilling machine drilling and explosive method combination patio
  • 相关文献

同被引文献8

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部