摘要
文章基于某基坑项目的工程地质和环境勘察,针对复杂地质环境和锚索施工的困难提出BIM技术在深基坑锚索施工中的应用,将传统的高强度和高风险施工作业变得可视、可控,通过采用BIM技术结合项目地质、周围环境等搭建的基坑支护结构三维模型,可以更好地展示基坑支护结构情况,同时借助BIM+云平台实现锚索施工的模拟演示,施工前发现问题并进行优化调整,提高了基坑锚索施工的质量和效率。
Based on the engineering geology and environmental survey of a foundation pit project,the application of BIM technology in deep foundation pit anchor cable construction is proposed in view of the complex geological environment and the difficulty of anchor cable construction makes the traditional high strength and high risk construction operations visible and controllable.Through the use of BIM technology combined with project geology,surrounding environment and so on to build a three-dimensional model of the foundation pit supporting structure,it can better intuitively display the situation of the foundation pit supporting structure.At the same time,BIM+cloud platform can be used to realize the simulation demonstration of anchor cable construction.Problems can be found and optimized before construction,which improves the quality and efficiency of foundation pit anchor cable construction.
作者
黄文平
张宏
HUANG Wen-ping;ZHANG Hong(China Construction Second Engineering Bureau Ltd.)
出处
《智能建筑与智慧城市》
2021年第11期63-64,共2页
Intelligent Building & Smart City