期刊文献+

积水采空区下穿隧道的地质问题与对策研究

Research of geological problems and countermeasures in tunnel under water-filled goaf
下载PDF
导出
摘要 当拟建隧道工程无法绕避采空区而采用下穿方案时,因其地质问题较多,勘察设计应尤为谨慎,以防施工期发生重大变更增加造价甚至影响建设运营安全。选取东南沿海地区某市政道路隧道实例,以采空区空间分布、采空区底部地层稳定性以及采空区积水性质与来源作为勘察要点详细分析积水采空区对隧道围岩分级的影响,针对性地提出了解决建议,对该隧道及类似隧道的建设具有一定的参考和指导作用。 When the proposed tunnel project can not avoid the goaf,due to many geological problems,the survey and design should be particularly cautious,in order to prevent major changes in the construction period,increase the cost and even affect the construction and operation safety.Taking a municipal road tunnel in southeast coastal area as an example,taking the spatial distribution of goaf,the stability of stratum at the bottom of goaf and the source of water in goaf as the key points of survey,this paper analyzes in detail the influence of water-filled goaf on the classification of tunnel surrounding rock,and puts forward corresponding suggestions,which has a certain reference and guiding role for the tunnel construction.
作者 余海强 YU Haiqiang
出处 《福建建设科技》 2021年第6期35-37,共3页 Fujian Construction Science & Technology
关键词 积水采空区 隧道勘察 地质问题 Water-filled Goaf Tunnel exploration Geological problems
  • 相关文献

参考文献5

二级参考文献65

共引文献97

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部