数字化背景下建设工程项目管理效能的提升策略研究 被引量:7

下载PDF
导出
摘要 建设工程项目结构复杂、施工周期长、建设风险高、资金投入大,提升建设工程项目管理效能是数字时代项目管理理论与工程管理实践面临的关键问题。基于TOE(Technology-Organization-Environment)理论框架,具体分析工程项目建设的实际情况,在数字化背景下构建工程项目管理效能影响因素的TOE框架,并分别从技术、组织和环境三个维度出发,分析各因素对建设工程项目管理效能的影响,对建设工程项目提升管理效能提出相应的政策建议。研究结果可以为建设行业在数字化背景下提升项目管理效能提供有效的切入点,并为相关部门决策和建设行业发展提供重要参考。
出处 《经济研究导刊》 2022年第3期153-155,共3页 Economic Research Guide
  • 相关文献

二级参考文献51

  • 1宁晓倩,王其藩.运用系统动力学模型进行项目时间/成本估算[J].科技导报,2004,22(9):54-57. 被引量:9
  • 2罗辉道,项保华.资源概念与分类研究[J].科研管理,2005,26(4):99-104. 被引量:32
  • 3Vaziri K,Carr P,Nozick L. Project planning for con-struction under uncertainty with limited resources [J],Journal of Construction Engineering and Management,2007,133(4): 268-276.
  • 4Afshar-Nadjafi B, Majlesi M. Resource constrained pro-ject scheduling problem with setup times after preemp-tive processes[J], Computers &- Chemical Engineering,2014,69: 16-25.
  • 5Browning T, Yassine A. Resource-constrained multi-project scheduling: Priority rule performance revisited[J]. International Journal of Production Economics,2010,126(2):212-228.
  • 6Lim A, Ma Hong, Rodrigues B,et al. New conceptsfor activity float in resource-constrained project manage-ment[J]. Computers Operations Research,2011,38(6): 917-930.
  • 7Cheng Minyuan,Tran D H, Wu Yuwei. Using a fuzzyclustering chaotic-based differential evolution with serialmethod to solve resource-constrained project schedulingproblems[J]. Automation in Construction, 2014,37 :88-97.
  • 8Azaron A,Katagiri H, Sakawa M. Time-cost trade-offvia optimal control theory in Markov PERT networks[J]. Annals of Operations Research, 2007,150(1) : 47-64.
  • 9Xu Jiuping, Zheng Huan,Zeng Ziqiang,et al. Discretetime-cost-environment trade-off problem for large-scaleconstruction systems with multiple modes under fuzzyuncertainty and its application to J inping-II Hydroelec-tric Project[J]. International Journal of Project Manage-ment, 2012,30(8): 950 - 966.
  • 10Tavana M, Abtahi A R, Khalili-Damghani K. A newmulti-objective multi-mode model for solving preemp-tive time - cost - quality trade-off project schedulingproblems [J], Expert Systems with Applications,2014,41(4): 1830-1846.

共引文献161

同被引文献52

引证文献7

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部