摘要
Based on the installation of the roof membrane of Lusail Stadium which is the main stadium of Qatar World Cup in 2022, a series of key technical challenges in the design and construction of the roof PTFE membrane of large stadiums are studied. Based on the analysis of the roof cable net system, the study formulated the overall sequence of membrane installation, and defined the construction method of membrane lifting and unfolding. Focusing on membrane fixing techniques with the tension rings, compression rings, and horizontal cable nodes, it also optimized membrane connection methods with arch and horizontal cable, and provided waterproof construction methods. According to the findings, the construction of stadium roof membranes should follow a logical sequence. The membranes’ fixing, connection and waterproof construction will have an important impact on the final quality.
出处
《施工技术(中英文)》
CAS
2021年第24期50-56,共7页
Construction Technology