摘要
结合实际施工案例,阐述了超大截面矩形顶管施工设备、管节、全自动测量、全自动注浆、全自动沉降监测等施工控制参数及技术措施,分析了超大截面矩形顶管后顶力、轴线水平和高程偏差、地面沉降量的变化规律,为今后此类工程施工提供指导与参考。
Combined with actual construction cases,the construction control parameters and technical measures of super-large rectangular pipe jacking construction equipment,pipe joints,automatic measurement,automatic grouting,and automatic settlement monitoring are explained,and the rear jacking force of super-large rectangular pipe jacking is analyzed.The variation law of axis level and elevation deviation,and ground subsidence provide guidance and reference for the construction of such projects in the future.
作者
刘宗钦
李扬
曹德万
LIU Zong-qin;LI Yang;CAODe-wan(Zhongyifeng Tunnel Engineering Co.,Ltd,Suzhou Jiangsu 215000 China)
出处
《江苏建筑》
2021年第6期55-58,共4页
Jiangsu Construction
关键词
超大截面矩形顶管
全自动测量
全自动注浆
全自动沉降监测
super-large cross-section rectangular pipe jacking
automatic measurement
automatic grouting
automatic settlement monitoring