摘要
为了满足日益增长的污水处理量的需求,长春市新建某污水处理厂,采用"高效沉淀池+改良A;O+高效澄清池+转盘滤池"为主要工艺。本文介绍了该污水处理厂具体工艺流程,并对运行期间的实际进出水水质进行分析,旨在评估工艺效果,为类似水质的污水处理厂在工艺方案制定方面提供参考。
In order to meet the increasing demand for sewage treatment capacity, a sewage treatment plant was built in Changchun City. The plant uses “high-efficiency sedimentation tank + improved A;O + high-efficiency clarification tank + rotary filter tank” as the main process. This article introduces the specific process flow and actual water quality treatment effects of the sewage treatment plant, aiming to provide a reference for the design of sewage treatment plants with similar requirements on effluent water quality.
作者
王玮琦
Wang Weiqi(China Urban and Rural Holdings Group Co.,Ltd.,Beijing 100029,China)
出处
《广东化工》
CAS
2022年第2期92-95,共4页
Guangdong Chemical Industry
关键词
城市污水处理
高效沉淀池
改良A
O工艺
转盘滤池
生物滤池除臭
urban sewage treatment
high-efficiency sedimentation tank
improved A2O process
rotary filter tank
biological filter deodorization