期刊文献+

济南黄河公路大桥改扩建工程公轨合建段区间隧道设计

Design of running tunnel combined construction of highway and railway of the reconstruction and expansion project of Jinan Yellow River highway bridge
下载PDF
导出
摘要 G104京岚线黄河公路大桥改扩建工程预留轨道交通7号线土建工程,公轨合建段区间隧道采用明挖顺作法施工。对设计要点进行了研究,包括结构选型,区间结构与新建高架桥、零点立交匝道桥等特殊位置关系,基坑围护设计及环境风险及处理等。经过比选,确定了安全、合理、经济的设计方案。 Jinan rail transit line 7 crossing the Yellow River will be constructed with the reconstruction and expansion project of Jinan Yellow River highway bridge,the running tunnel combined construction of highway and railway is adopted cut and cover method.The design highlights of the running tunnel is introduced,such as selection of structural system,the special relationship between the structure of running tunnel and newly-built viaduct or ramp bridge,design of the retaining structure,and the treatment of environmental risks.According to the scheme comparison,the results show the design scheme is safe reasonable and economical.
作者 吴涛 栾少华 郭永飞 臧韶宁 WU Tao;LUAN Shaohua;GUO Yongfei;ZANG Shaoning(Shandong Provincial Communications Planning and Design Institute Group Co.,Ltd.,Shandong Jinan 250031 China;Zhaoyuan Municipal Government Investment Project Construction Service Center,Shandong Zhaoyuan 265400 China;Zhaoyuan Planning and Design Institute,Shandong Zhaoyuan 265400 China)
出处 《山东交通科技》 2022年第1期63-65,共3页
关键词 黄河公路大桥 公轨合建 明挖 区间隧道 Yellow River highway bridge combined construction of highway and railway cut and cover running tunnel
  • 相关文献

参考文献5

二级参考文献26

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部