城市水环境治理项目顶管施工现场管理优化

On-site Management Optimization of Pipe Jacking for Urban Water Environment Treatment Project
下载PDF
导出
摘要 以耒阳市城区排水防涝建设项目顶管工程的现场实况为基础,结合目前顶管施工行业的现状,系统性地梳理施工现场管理过程中常见的突出问题,通过归纳总结后将其划分为两个方面——内部管控难点和外部影响因素。同时就管控过程中解决问题的实践经验加以针对性思考,提出具有建设性的管理优化办法。 Based on the field conditions of pipe jacking project of urban drainage and waterlogging protection project in Leiyang City,combined with the current situation of pipe jacking construction industry,this paper systematically combines the common outstanding problems in the process of construction site management.After summarizing,the problems are divided into internal control difficulties and external influencing factors.At the same time,this paper gives specific consideration to the practical experience of solving problems in the process of management and control,and puts forward constructive management optimization methods.
作者 蒲雄 PU Xiong(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处 《云南水力发电》 2022年第4期158-161,共4页 Yunnan Water Power
关键词 水环境治理 顶管施工 工程管理 优化办法 water environment treatment pipe jacking construction engineering management optimized approach
  • 相关文献

参考文献8

二级参考文献24

共引文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部