宁波轨道交通5号线经堂庵跟车辆段综合管线施工阶段应用BIM技术,通过BIM的模型建造、3D可视化、管线碰撞、方案优化等方面发现设计图纸中的缺陷,优化设计方案,协同管线各设计专业,事前把控管线设计质量,事中控制施工中质量、安全、进度的管理,实现了真正意义上的BIM指导设计施工,快速解决问题,有效提升了车辆段综合管线施工精细化管理水平,实现了效益最大化。
BIM Technology is applied in the integrated pipeline construction stage of Ningbo Rail Transit Line 5 Jingtang Angen depot.Found out defects in design drawings through BIM’s model construction,3D visualization,pipeline collision and scheme optimization.Optimize the design scheme,cooperate with various pipeline design majors,control the quality of pipeline design in advance,and control the management of quality,safety and progress in construction,so as to realize BIM guidance of design and construction in the real sense,quickly solve problems,effectively improve the fine management level of integrated pipeline construction in the depot and maximize benefits.
作者
杨雪
YANG Xue(China Railway 10th Bureau Group No.5 Engineering Co.,Ltd.,Suzhou 215163,China)
出处
《现代信息科技》
2021年第24期117-119,123,共4页
Modern Information Technology
关键词
BIM技术
综合管线
3D可视化
管线碰撞
BIM technology
integrated pipeline
3D visualization
pipeline collision