某电站底孔预应力闸墩三维有限元计算 被引量:2

Three dimensional finite element calculation of prestressed gate pier at bottom outlet of a Hydropower Station
下载PDF
导出
摘要 文中针对国外某电站弧门推力超过2500 t,在执行国外标准的前提下,采用U形预应力闸墩设计方案,并对闸墩进行了有限元数值仿真模拟,成功地解决了薄闸墩、大推力的关键性技术难题,在工程安全性和经济性两方面有一定价值,对我国今后开展类似国外项目具有指导意义。 In this paper,U-shaped prestressed gate pier design scheme is adopted for a foreign power station whose arc gate thrust exceeds 2500 t under the premise of implementing foreign standards.The finite element numerical simulation of gate pier is carried out,which successfully solves the key technical problems of thin gate pier and high thrust.It has certain value in engineering safety and economic economy,and has guiding significance for similar foreign projects in China in the future.
作者 谭显文 TAN Xian-wen
出处 《东北水利水电》 2022年第4期1-3,23,71,共5页 Water Resources & Hydropower of Northeast China
关键词 预应力 有限元 U形 大推力 闸墩 fprestress finite element U-shaped high thrust gate pier
  • 相关文献

参考文献12

二级参考文献34

共引文献48

同被引文献21

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部