煤矿开拓大巷不同布置方案的对比分析

Comparative Analysis of Different Layout Schemes of Coal Mine Development Roadway
下载PDF
导出
摘要 针对倾斜煤层开采过程中开拓大巷的布置方式,设计了两种不同的方案,根据煤柱受到的应力作用及矿井上下山移动角的作用对煤柱的宽度进行计算;为保证煤产量,对比确定了最佳开拓大巷的布置方式,此时预留煤柱的宽度为30 m。 According to the layout of the development roadway in the mining process of inclined coal seam,two different schemes are designed.The width of the coal pillar is calculated according to the stress of the coal pillar and the movement angle of the mine.In order to ensure the coal output,the layout of the best development roadway is determined by comparison.At this time,the width of the reserved coal pillar is 30 m.
作者 王旭杰 Wang Xujie(Mine Construction Branch,Xishan Coal Electricity Construction Engineering Group Co.,Ltd.,Taiyuan Shanxi 030053)
出处 《山西冶金》 CAS 2022年第2期383-385,共3页 Shanxi Metallurgy
关键词 开拓大巷 布置 倾斜煤层 煤柱宽度 development of main roadway arrangement inclined coal seam coal pillar width
  • 相关文献

参考文献12

二级参考文献66

共引文献59

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部