期刊文献+

综采工作面液压支架快速回撤工艺应用 被引量:3

Application of Rapid Retraction Process for Hydraulic Support at Header Working Face
下载PDF
导出
摘要 为了保证8103工作面液压支架安全快速回撤,提高支架回撤效率,降低回撤期间事故率,晋华宫矿准备区通过技术研究,决定对工作面液压支架采用后退式支架掩护式回撤工艺,并对支架回撤期间三角区域采取π型顶梁、单体支柱以及木垛进行联合支护。通过实际应用效果来看,相比8102、8101工作面,8103工作面回撤周期缩短了4.5 d,回撤期间未出现由于三角区域顶板垮落而导致的压架、伤人等事故,保证了工作面支架安全快速回撤,取得了显著应用成效。 In order to ensure the safe and rapid retraction of hydraulic brackets at 8103 working face,improve the efficiency of bracket retraction and reduce the accident rate during retraction,Jinhuagong mine preparation area decided to propose the retreating bracket cover retraction process for hydraulic brackets at working face through technical research,and to adopt π-type roof beam,single pillar and wooden pallet for joint support in the triangle area during bracket retraction.Compared with 8102 and 8101 working face,the retraction cycle of 8103 working face is shortened by 4.5 d.During the retraction period,there is no collapse of the roof plate in the triangle area,which leads to crushing and injury accidents,ensuring the safe and rapid retraction of the working face brackets and achieving significant application results.
作者 张锐 Zhang Rui(Jinhuagong Mine,Jinneng Holding Coal Group,Datong Shanxi 037001)
出处 《机械管理开发》 2022年第4期177-178,共2页 Mechanical Management and Development
关键词 综采工作面 液压支架 回撤工艺 支护技术 comprehensive mining working face hydraulic support retraction process support technology
  • 相关文献

参考文献5

二级参考文献36

共引文献19

同被引文献14

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部