摘要
柏香岭大桥位于德江(合兴)至余庆高速公路工程第DYTJ-5A标段,施工过程中,悬浇段挂篮是关键环节。论文以柏香岭大桥为例,对其悬浇段挂篮施工要点进行分析,并为悬浇段挂篮施工质量控制提出对策。
Baixiangling Bridge is located in the DYTJ-5A section of the Expressway project from Dejiang(Hexing) to Yuqing,in the construction,the hanging basket is the key link.Based on this,this paper takes Baixiangling Bridge as an example to analyze the key points of hanging basket construction in cantilever section of Baixiangling Bridge,and put forward countermeasures for quality control of hanging basket construction in cantilever section.
作者
赵双
ZHAO Shuang(CCCC First Highway Group Co.Ltd.Huazhong Engineering Co.Ltd.,Wuhan 430014,China)
出处
《工程建设与设计》
2022年第8期172-174,共3页
Construction & Design for Engineering
关键词
悬浇段挂篮
施工要点
质量控制
hanging basket for casting section
construction key points
quality control