期刊文献+

基于BIM的变电站土建工程质量验收管理 被引量:6

Quality Acceptance Management of Substation Civil Engineering Based on BIM
下载PDF
导出
摘要 变电站作为电力行业中输送电力能源必不可少的基础设施,其土建工程质量好坏会对整个输变电工程产生巨大的影响。然而,传统的质量验收工作效率低下,成效不佳,质量缺陷也频繁出现。为应对变电站土建工程质量验收工作存在的问题,本文首先提出了基于BIM的变电站土建工程智能化质量验收体系;然后基于现行规范标准,构建了变电站土建工程质量验收规范数据库;在此基础上,利用Revit二次开发技术,开发了智能化质量验收工具箱,并通过实例应用体现了工具箱的应用价值。该质量验收体系和智能化质量验收工具箱优化了质量验收工作的形式和内容,有效提高了工作效率,具有一定的现实意义。 As an essential infrastructure of power transmission in the power industry,the quality of substations has a significant impact on the entire power transmission and transformation project.However,the traditional quality acceptance work has poor efficiency and results,resulting in the frequent occurrence of quality defects.In order to cope with the problems in the quality acceptance of substation civil engineering,this paper first proposed an intelligent quality acceptance system of substation civil engineering based on BIM.Then,according to the current specifications and standards,a substation civil engineering quality acceptance specification database was developed.On this basis,with Revit secondary development technology,an intelligent quality acceptance toolbox was developed,and the application value of the toolbox was demonstrated through the case study.The quality acceptance system and intelligent quality acceptance toolbox optimize the forms and contents of quality acceptance work,effectively improve work efficiency,and have a certain practical significance.
作者 马文亮 陆莹 王荣 王宇涛 刘洁 MA Wenliang;LU Ying;WANG Rong;WANG Yutao;LIU Jie(Jiangsu Electric Power Company Maintenance Branch,Nanjing 211189,China;School of Civil Engineering,Southeast University,Nanjing 211189,China)
出处 《土木工程与管理学报》 2022年第3期55-60,74,共7页 Journal of Civil Engineering and Management
基金 国家社科基金(一般项目)(19BGL238)。
关键词 变电站土建工程 质量验收 BIM 二次开发技术 工具箱 substation civil engineering quality acceptance BIM secondary development technology toolbox
  • 相关文献

参考文献8

二级参考文献40

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2夏海兵,辛佐先,熊诚,刘立慧.BIM技术在PC住宅全生命周期中的应用[J].施工技术,2013,42(S2):157-160. 被引量:23
  • 3ParkC S, Lee D Y, Kwon O S, et al. A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template [J]. Automation in Construction, 2013, 33: 61.
  • 4Kwon O S, Park C S, Lira C R. A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality [J]. Automation in Construction, 2014, 46 : 74.
  • 5Tsai Y H, Hsieh S H, Kang S C. A BIM-enabled approach for construction inspection[C]//Computing in Civil and Building Engineering. [S. 1.]: ASCE, 2014.-721-728.
  • 6马智亮,毛娜,刘赫、等.基于BIM技术的建筑工程施工质量监管系统框架没计[c]//第十七届全国工程建设计算机应用大会论文集.北京:人民交通出版社,2014:377-382.
  • 7buildingSMART. Model-Industry Foundation Classes (IFC) [S/ OL]. [2015-03-12]. http://www, buildingsmart, org/ standards/ifc.
  • 8Netherlands Organization for Applied Scientific Research. BIMServer. org. Github [ EB/OL]. [ 2015-03-14 ]. https:// github, com/opensourceBIM/.
  • 9BIMserver Netherlands Organization for Applied Scientific Research. bimvie, ws. Github [EB/OL]. [ 2015-01-17 ]. https://github. com/opensourceBIM/bimvie, ws.
  • 10Netherlands Organization for Applied Scientific Research. Plugin-Development of BIMServer. Github [ EB/OL]. [ 2015- 01-22 ]. https://github, com/opensourceBIM/BIMserver/ wiki/Plugin-Development.

共引文献158

同被引文献61

引证文献6

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部