摘要
光传送网(Optical Transport Network,OTN)施工技术逐渐透明,促使项目需要通过施工资源优化提升利润空间。以内蒙古电力通信OTN项目为例,基于对项目约束的充分分析,运用系统分析方法,从材料运输路线优化、施工流水优化以及工程队配置优化3个角度解决了OTN项目施工资源配置问题。最后提出了符合OTN项目施工特点的成本控制优化方法,以期为同类项目提供借鉴。
Optical Transport Network(OTN)construction technology is gradually transparent,which makes the project needs to improve the profit space through construction resource optimization.Taking Inner Mongolia project as an example,based on the full analysis of project constraints,the construction resource allocation problem of OTN project was solved from the perspectives of material transportation route optimization,construction flow optimization and engineering team configuration optimization.Finally,the cost control optimization method that meets characteristics of OTN project construction is proposed,expected to provide reference for similar projects.
作者
张铎
冯东梅
邱凯义
ZHANG Duo;FENG Dongmei;QIU Kaiyi(School of Management,Shenyang Jianzhu University,Shenyang 110168,China;School of Business Administration,Liaoning Technology University,Huludao 125105,China;(Inner Mogolia)Information and Communication Technology Co.,Ltd,Huhehot 010010,China)
出处
《沈阳建筑大学学报(社会科学版)》
2022年第3期259-264,共6页
Journal of Shenyang Jianzhu University:Social Science
基金
科技部国家重点研发计划“西露天矿区”环境地质灾害风险评估(2017YFC1503102)(51277090)
关键词
OTN项目
施工资源管理
系统优化
实施评价
OTN project
management of construction resources
system optimization
implementation evaluation