期刊文献+

高陡人工边坡加固效果数值模拟分析 被引量:1

Analyzing the reinforcement effect of high man-made slope by modelling
下载PDF
导出
摘要 高陡边坡极易发生坡体滑动,本文以某高陡人工边坡工程为研究对象,通过建立三维有限元模型,分别对削坡加固、抗滑桩加固和抗滑桩结合预应力锚索加固三种支护形式的加固效果进行分析。结果表明:经过削坡后,发生较大水平位移的区域明显减小且U型圆弧状滑移段消失;其次,采用抗滑桩支护时,抗滑桩桩顶周边土层仍会发生较大位移,而采用抗滑桩结合预应力锚索支护时,土层位移量将会显著降低;另外,削坡支护与抗滑桩结合预应力锚索支护对边坡稳定性影响的侧重点各不相同,削坡主要通过减小边坡坡度来提高边坡稳定性,而抗滑桩结合预应力锚索支护主要通过减小边坡位移来提高边坡稳定性。 High and steep slopes are highly susceptible to sliding. This paper takes a high and steep artificial slope project as the research object, and analyzes the reinforcement effect of three forms of support, namely slope cutting reinforcement and anti-slip pile reinforcement, and anti-slip pile combined with prestressed anchor cable reinforcement, respectively, by establishing a three-dimensional finite element model. The results show that after slope cutting,the area with large horizontal displacement is significantly reduced and the U-shaped arc-shaped slip section disappears;secondly,the soil layer at the top of the anti-slip pile will still have large displacement when anti-slip pile is used,while the soil layer displacement will be significantly reduced when anti-slip pile combined with anchor cable reinforcement is used;in addition, slope cutting and anti-slip pile combined with anchor cable support have different emphasis on slope stability. Slope cutting mainly improves slope stability by reducing slope gradient, while anti-slip pile combined with anchor cable support mainly improves slope stability by reducing slope displacement.
作者 徐化新 XU Huaxin
出处 《福建建设科技》 2022年第5期34-38,共5页 Fujian Construction Science & Technology
关键词 人工边坡 稳定性 削坡 预应力锚索 数值模拟 artificial slope stability cut slope pre-stressed anchor cable numerical simulation
  • 相关文献

参考文献12

二级参考文献131

共引文献255

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部