鹤煤九矿陷落柱注浆加固技术探究 被引量:4

Research on grouting reinforcement technology of collapsed column in No.9 Coal Mine of Hebi Coal Industry
下载PDF
导出
摘要 针对鹤壁九矿3103下底板抽放巷外段掘进期间揭露的陷落柱,通过钻探取心工作来确定该陷落柱的范围、地质及水文地质的分布情况以及含水、导水特征,根据分析结果采取合理的防治水措施,以井下底板注浆加固为主,对该陷落柱进行底板注浆加固治理,综合评价对该陷落柱的研究治理效果,为下一步采区工作面的布置提供可靠的技术资料依据,为矿井及企业的防治水工作提供新的技术支持。 For the collapsed column exposed during the excavation of the outer section of the 3103 lower floor extraction roadway in No.9 Coal Mine of Hebi Coal Industry,the scope of the collapsed column,the distribution of geology and hydrogeology,and the characteristics of water content and water conduction were determined by drilling and coring.Reasonable water prevention and control measures are mainly based on the grouting reinforcement of the underground floor,and the collapsed column is grouted for the reinforcement treatment of the floor,comprehensively evaluates the research and treatment effect of the collapsed column,and provides reliable technical data for the layout of the working face in the next mining area.Provide new technical support for mine and enterprise water control work.
作者 朱斌 倪惠宁 ZHU Bin;NI Hui-ning(No.9 Coal Mine of Hebi Coal Industry(Group)Co.,Ltd.,Hebi 458030,China;School of Mines,China university of Mining and Technology,Xuzhou 221116,China)
出处 《煤炭科技》 2022年第4期178-182,共5页 Coal Science & Technology Magazine
基金 国家自然科学基金面上项目(52174138)。
关键词 陷落柱 底板注浆加固 勘探 collapsed column floor grouting reinforcement exploration
  • 相关文献

参考文献14

二级参考文献74

共引文献70

同被引文献44

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部